EPDM Playground Floor
SKU: 100 | Category: Playground Flooring and Equipment | In Stock (100 available)
Ksh 5,000
We respond within 1hr
Quick Specifications
Transform any outdoor space into a safe, vibrant, and high-performance play environment with our Seamless EPDM Wet-Pour Rubber Flooring. Specially engineered for Kenyan climate conditions, this two-layer rubber surfacing system combines maximum shock absorption with complete design freedom.
Key Features:
- Certified Fall Protection: Built with a dense, recycled SBR base layer underneath a virgin EPDM wear layer to absorb heavy impacts around swings, slides, and climbing frames.
- UV & Weather Resistant: Formulated with advanced UV stabilizers to prevent hardening, cracking, or color fading under intense sunlight and heavy rain.
- Seamless & Inclusive: Creates a smooth, trip-free, jointless surface that allows easy access for strollers and wheelchairs.
- Custom Design Options: Hand-troweled on-site, allowing for custom color blends, interactive ground games (hopscotch, jump rings), 3D play mounds, and embedded logos.
- Low Maintenance & Fast-Draining: The porous structure permits rapid rainwater drainage, eliminating standing puddles and mud after heavy downpours.
Ideal Applications:
- Schools & Daycare Centers
- Residential Gardens & Estate Parks
- Hotels & Resort Play Areas
- Public Commercial Parks & Recreational Facilities
Specifications:
- Top Layer: 10mm – 15mm UV-stabilized virgin EPDM granules
- Base Layer: High-density impact-absorbing recycled SBR rubber
- Suitable Sub-Bases: Concrete, asphalt, or compacted crushed stone
- Warranty & Service: Turn-key site evaluation, installation, and after-sales support across all major towns in Kenya including Nairobi, Kiambu, Machakos, Nakuru, and Mombasa.
Perfect for Playground Flooring and Equipment
This tile is ideally suited for playground flooring and equipment applications, providing both functionality and aesthetic appeal.
Technical Specifications
Installation & Maintenance Guide
Installation Tips for EPDM Playground Floor
- Ensure the surface is clean, level, and dry before installation
- Use appropriate adhesive for tiles
- Allow for 2-3mm grout lines for best results
- Wait 24-48 hours before grouting
- Use spacers to maintain consistent grout lines
Maintenance
- Clean regularly with mild detergent and water
- Avoid harsh chemicals that may damage the finish
- Seal grout lines annually to prevent staining
- Wipe up spills immediately to prevent staining
Need Professional Installation?
We can connect you with experienced tile installers (fundis) in your area. Contact us for referrals.
Ready to Order EPDM Playground Floor?
Get in touch with our sales team for bulk orders and wholesale prices